Well we had a very busy, tiring and productive weekend. In the last 2 weeks a lot has happened. I have had the concrete pad poured in front of the building so we actually have a parking area and ramp going into the shop (you know, for the low riders, lol :bs: ). The shop bathroom and showroom walls have been built. And quite a bit of other things that you wouldn't even notice but are really time consuming. Our new windows and front door are supposed to be installed later this week. Over the next week or two we will be working on getting shop equipment in, wiring, showroom tiled, wiring, customer bathroom in, wiring, sales counter, more wiring....you get the idea. Feel free to come by!
1614 Barnwell Street
Columbia, SC 29201