Got the trailer portion of the equation taken care of last month.
Hoping to have the CJ 100% by 8/14 weekend so that will give me two full weeks to get the tow rig gone over.
Things to do/check:
-Install auxiliary fuel tank (stupid Chevrolet and their baby fuel tank)
-Check front end components and likely replace TRE's and Sway bar bushings
-Replace trans cooler lines (developed a small leak recently)
-Fuel filter
-Oil and filter change
-Rotate tires and inspect brakes (brakes have around 15k miles so should be solid)
Yes i'm a gluten for punishment and have drug this out to well close to the last minute. My goal will be to have all items complete 8/21 weekend and start to prep the parts and truck packing the week of the 24th.
Hoping to have the CJ 100% by 8/14 weekend so that will give me two full weeks to get the tow rig gone over.
Things to do/check:
-Install auxiliary fuel tank (stupid Chevrolet and their baby fuel tank)
-Check front end components and likely replace TRE's and Sway bar bushings
-Replace trans cooler lines (developed a small leak recently)
-Fuel filter
-Oil and filter change
-Rotate tires and inspect brakes (brakes have around 15k miles so should be solid)
Yes i'm a gluten for punishment and have drug this out to well close to the last minute. My goal will be to have all items complete 8/21 weekend and start to prep the parts and truck packing the week of the 24th.